AS/NZS 1554.1 (where applicable)

Structural Welding & Fabrication

Sample plan: ITP-WELD-01: Structural Steel Fabrication

Key risks

  • Welding outside approved procedures or qualifications
  • Incomplete traceability of welds and materials
  • Inspection and NDT hold points missed or not evidenced

Inspection types

  • Fit-up and joint preparation
  • Welding visual inspection
  • Weld map and welder traceability
  • NDT request and result tracking
  • Repair and re-inspection

Fabrication traceability

Connect inspection records to weld IDs, drawings, approved procedures, personnel qualifications, material traceability and required NDT evidence. Inspection stages and acceptance criteria should be configured from the approved ITP and project standards.